Case Study

Conditions

Observations

Key Findings

Rocky Ford Highline

Key Findings: The water savings from using CanalSentryTM to reduce seepage in the 4.4 miles of RockyFord Highline was 7.9 acre feet/day, a 64% reduction in seepage.

Billings Bench Canal

Key Findings: The water savings from using CanalSentryTM to reduce seepage in the 2.7 miles of the Billings Bench Canal was 11.9 acre feet/day and a 60% reduction in seepage.

Riverside Ditch

Key Findings: The water savings from using CanalSentryTM to reduce seepage in the Riverside Ditch was 0.79 acre feet/day. 57% reduction in seepage.